Separate supplier deliveries staged for receiving checks and warehouse records

Check deliveries before export

Who can check my deliveries and packing before shipping from China?

Buildcargo directly manages its Shenzhen receiving warehouse. We record package count, labels, visible outer condition, final packed dimensions and gross weight, while opening packages or performing product-level inspection remains a separately agreed service.

Direct answer

Buildcargo records each referenced delivery’s package count, labels, visible outer condition, obvious differences, final packed dimensions and gross weight. By default, we do not open every factory-packed item unless you request a separate inspection scope. After checking, we prepare the agreed packing and consolidate the cargo.

  • Reviewed by Ethan Chen · August 29, 2026
  • Days 1–14 free · RMB 100 per shipment per day from day 15

Before a supplier delivers.

Each supplier needs a reference, product group, expected ready date, package count and delivery or pickup instruction. This prevents orders from different factories being treated as one unidentified pile. You may use suppliers you selected; Buildcargo does not require purchases from a preferred network. See the different-supplier collection plan for how those references become one shipment.

Three inspection levels

Know what is checked—and what is not.

Receiving, opening a selected package and inspecting a product are three different scopes. The written project record should identify which level applies.

Basic receivingIncluded by default
Visible and countable factsSupplier reference, package count, labels, visible outer condition, obvious differences, final packed dimensions and gross weight. Factory-sealed packages normally stay closed.
Authorized visible-condition checkOnly with customer approval
Selected packages onlyOpen the agreed package, compare visible internal appearance with the supplied reference, note obvious visible damage or shortage, then reseal. This cannot reveal every concealed defect.
Product-specific inspectionSeparate paid scope
Compared with a written standardOrder, drawing, approved sample or checklist; agreed sample size, opening permission and acceptance rules. This is not represented as independent third-party QC, certification, laboratory testing or an engineering approval.

Default rule: Buildcargo does not open every factory-packed product. If you need model, colour, finish, hardware, dimensions, material documents or functional checks compared with a reference, agree the product-specific scope before suppliers deliver.

What happens when receiving finds a difference.

If a package is missing, incorrect or visibly damaged, the review follows three evidence points: destination-delivery records where applicable, Shenzhen warehouse video/count/weight, and the supplier’s dispatch record. The next action—hold, replace, inspect, repack or continue—is confirmed with the customer.

The receiving check and packing are separate steps. After the check, suitable factory packing can be retained and resealed; packing that does not meet the agreed export plan can be reinforced or replaced under the written packing scope.

Fourteen days of free storage.

The storage clock begins on the calendar day the first batch for the shipment reaches the Shenzhen warehouse. Days 1–14 are free. From day 15, storage is RMB 100 per shipment per calendar day. Longer storage can be arranged in writing. The confirmed period, cargo footprint and any special handling still belong in the shipment record.

Evidence that connects receiving to the next decision.

The agreed evidence can include receiving records, outer-condition photos, dimensions and weight, packing decisions, loading images, container or vehicle reference, seal record and the next milestone. Evidence availability depends on the mode and written service scope.

Send this before the first delivery.

  • Supplier names or references and contact details.
  • Expected ready dates and package counts.
  • Product list, photos and any inspection standard.
  • Which packages may be opened and resealed.
  • Final destination and target shipping window.

Missing storage, QC and evidence details will be listed as items requiring written confirmation rather than assumed.

Start with one product photo or order screenshot.

Tell us the destination country. We’ll first check whether it fits; full details can follow later.

Send One Photo